Balustrade OP11
SKU: OP11.
Unit: m
Delivery time: 1 nädal
Unit: m
Delivery time: 1 nädal
OP11 is a balustrade / double offset handrail.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Similar products
OP6 is a balustrade / toeboard for level applications, greater than one metre
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP6.
, Delivery time: 1 nädal
OP12 is a balustrade / double offset handrail & kerbrail.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP12.
, Delivery time: 1 nädal
OP14 is a single Inline Handrail / Kerbrail For disabled ramps under one metre (FFL)
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP14.
, Delivery time: 1 nädal
OP28 is a double offset handrail / on hob.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP28.
, Delivery time: 1 nädal
The OP2 safety barrier consists of two rails. The set is modular and includes tubes and clamps. Smart clamps and a Ø 48 mm steel tube are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm tubes. The set is delivered in parts.
SKU: OP2.1000
, Qty: Out of Stock
145,00 €
OP5 safety barrier module.
As a standard solution, the barriers are hot-dip galvanized.
As a standard solution, the barriers are hot-dip galvanized.
SKU: OP5.MODL.K
, Qty: Out of Stock
148,40 €




