Bikeway barrier OP25
SKU: OP25.
Unit: m
Delivery time: 1 nädal
Unit: m
Delivery time: 1 nädal
OP25 is top rail / balustrade Infill bikeway barrier with offset top rail and balustrade infill for level and rake.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Similar products
OP11 is a balustrade / double offset handrail.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP11.
, Delivery time: 1 nädal
OP13 is a single inline handrailf for stairs and level applications under one metre.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP13.
, Delivery time: 1 nädal
OP18 single offset handrail / on hob for stairs & level applications under one metre (FFL) with offset (often used on concrete hobs).
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP18.
, Delivery time: 1 nädal
OP29 is a double offset handrail / kerbrail.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP29.
, Delivery time: 1 nädal
OP30 is a twin offset handrail for the centre of a wide stair.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP30.
, Delivery time: 1 nädal
OP5 is a standard balustrade for level applications, greater than one metre (FFL).
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP5.
, Delivery time: 1 nädal




