Handrail OP2 L=1000
SKU: OP2.1000
Unit: set
Qty: Out of Stock
Unit: set
Qty: Out of Stock
Price:
145,00 €
price inc. tax 179,80 €
The OP2 safety barrier consists of two rails. The set is modular and includes tubes and clamps. Smart clamps and a Ø 48 mm steel tube are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm tubes. The set is delivered in parts.
Similar products
OP14 is a single Inline Handrail / Kerbrail For disabled ramps under one metre (FFL)
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP14.
, Delivery time: 1 nädal
OP19 is a single offset handrail / kerbrail for disabled ramps under one metre (FFL) with offset.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP19.
, Delivery time: 1 nädal
OP20 is a single offset handrail / midrail for level, ramp and stair applications under one metre (FFL) and midrail for extra protection.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP20.
, Delivery time: 1 nädal
OP25 is top rail / balustrade Infill bikeway barrier with offset top rail and balustrade infill for level and rake.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP25.
, Delivery time: 1 nädal
OP26 is top rail / handrail & balustrade infill bikeway barrier with offset top rail, handrail and balustrade infill for level and rake.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP26.
, Delivery time: 1 nädal
OP29 is a double offset handrail / kerbrail.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
Smart clamps and a steel pipe with a size of Ø 48 mm are used for assembly. If desired, the safety barrier can also be assembled from Ø42 or Ø60mm pipe.
As a standard solution, the railings are hot-dip galvanized.
SKU: OP29.
, Delivery time: 1 nädal




